Metal Technology 26Hi+ Bi-fold door system
3nr Bi-fold door sets installed looking over the garden on this lovely new build property in Caldy, Cheshire. Works completed for Elate Construction.
3nr Bi-fold door sets installed looking over the garden on this lovely new build property in Caldy, Cheshire. Works completed for Elate Construction.
Contract completed with Eric Wright Construction. The +£160k glazing package really breaks up the building nicely. Systems installed on this project; *Comar 6 capped curtain walling system. *Comar 5Pi top hung / fixed light thermally enhanced window system.
Contract completed with Seddon Construction. +£265k glazing package. Systems being used on this project; *Metal Technology System 17 capped curtain walling system. *Metal Technology System 10 commercial door system.
Installation completed for Cubic Group. The +£235k glazing package is now completed. Systems installed on this project; *Comar 6 capped curtain walling system. *Comar 9Pi rebated thermally broken door system. *Comar 7Pi+ Lift & slide door systems.
Works currently being installed for John Turner Construction. The +£85k glazing package has recently started on site. Systems being used on this project; *Comar Architectural 6EFT capped curtain walling system. *Comar Architectural 9Pi tilt & turn window system with glazed-in louvre ventilation system above . *Comar Architectural 7Pi AFT commercial door system.
Contract Secured with Anwyl Construction & John McCall Architects. The +£138k glazing package has recently started on site. Systems being used on this project; *Metal Technology System 17 capped curtain walling system. *Metal Technology System 10-35Hi thermally enhanced commercial door system. *Veka Upvc windows.
Contract Secured with Krolcorlett Construction. The +£27k glazing package will start on site this Summer. Systems being used on this project; *Comar Architectural 6EFT capped curtain walling system. *Comar 5Pi windows to the 1st floor. *Comar 7 door system operated with automatic gearing.
Aluminium Glazing package being installed on Bowgreave Rise Care Home, Garstang. The +£500k glazing package has now started on site. Eric Wright Construction are the Main contractor on this project. *Project glazing package also includes ‘Picture frame’ feature flashings, fire stopping, acoustic bafflers, EPDM to perimeter of screens, achieving low u’values, and the list goes