Archives: 13 June 2022

St Winefrede’s Church Campus – Huge Baird College, Bootle

Works currently being installed for John Turner Construction. The +£85k glazing package has recently started on site. Systems being used on this project; *Comar Architectural 6EFT capped curtain walling system. *Comar Architectural 9Pi tilt & turn window system with glazed-in louvre ventilation system above . *Comar Architectural 7Pi AFT commercial door system.

Greenheys Road Development, Wallasey

Contract Secured with Anwyl Construction & John McCall Architects. The +£138k glazing package has recently started on site. Systems being used on this project; *Metal Technology System 17 capped curtain walling system. *Metal Technology System 10-35Hi thermally enhanced commercial door system. *Veka Upvc windows.

Home Bargain Store, Chester

Contract Secured with Krolcorlett Construction. The +£27k glazing package will start on site this Summer. Systems being used on this project; *Comar Architectural 6EFT capped curtain walling system. *Comar 5Pi windows to the 1st floor. *Comar 7 door system operated with automatic gearing.

Bowgreave Rise

Aluminium Glazing package being installed on Bowgreave Rise Care Home, Garstang. The +£500k glazing package has now started on site. Eric Wright Construction are the Main contractor on this project. *Project glazing package also includes ‘Picture frame’ feature flashings, fire stopping, acoustic bafflers, EPDM to perimeter of screens, achieving low u’values, and the list goes